Annexation Program
B.G. Municipal Codes
Bids Being Accepted
Community Links
Forms & Documents
Job Opportunities
Community Newsletter
News Articles
Park Improvements
Photo Gallery
FAQs
Site Map
cityofbg.org
>
Departments
>
Public Works: Engineering
> Important Information
Public Works: Engineering
Important Information
Click on a link below to view the related documents. Some of the following are in PDF format and require
Acrobat Reader
in order to be read.
Miscellaneous Documents and Links
Standard Details (PDF format)
Storm Water Management Plan
Transportation System Plan
Water System Plan
Miscellaneous Documents and Links:
Salmon Creek Wastewater Management System
SE Grace Improvement Project Update
Standard Details (PDF format)
Construction Requirements
Sanitary Construction Requirements
Water Construction Requirements
Sanitary Sewer
SS-1.0 General Notes
SS-2.0 Standard Precast Manhole
SS-2.1 Top Slab For Standard Precast Manhole
SS-2.2 Standard Manhole Connection Details
SS-2.3 Standard Manhole Frames & Covers
SS-2.4 Step Detail
SS-2.5 Inside Drop Manhole Connection
SS-2.6 Outside Drop Manhole Connection
SS-2.7 Standard Sewer Cleanout
SS-3.0 Four-Inch Lateral Connection
SS-3.1 Six-Inch Lateral Connection
SS-3.2 Sampling Manhole
SS-3.4 Grease Interceptor
SS-3.5 Standard Oil/Water Separator - Sanitary
SS-4.0 Pipe Bedding (Rigid Pipe)
SS-4.1 Pipe Bedding (Flexible Pipe)
SS-4.2 Typical Trench Backfill Bedding
SS-4.3 Concrete Encased Sewer Pipe
SS-4.4 Anchor Wall Detail
SS-4.5 Typical Water Main/Sanitary Crossing
SS-5.0A Air Vacuum/Release Vault With Odor Control Canister
SS-5.0B Air Vacuum/Release Vault With Odor Control Canister
SS-5.1 Buried Gate Valve
SS-5.2 Typical Pressure Cleanout
SS-5.3 Toning Wire And Locator Tape
SS-5.4 Air Release Valve
SS-5.5 Pig Launch Detail
SS-6.0 Pump Station Site Plan
SS-6.1 Site Piping Schematic
SS-6.2 RPBA And Yard Hydrant Detail
SS-6.3 Bioxide Feed System
SS-6.4 Typical Control Panel Detail
SS-6.5 Electrical Details 1
SS-6.6 Electrical Details 2
SS-6.7 Electrical Details 3
Water
Table Of Contents
WA-1.0 General Water Notes
WA-1.1 General Backflow Notes
WA-2.0 1" Water Service - Residential Only
WA-2.1 1-1/2" & 2" Water Service
WA-2.2 Compount Water Service Meter
WA-2.3 Fire Hydrant Assembly
WA-2.4 Hydrant Retaining Wall
WA-3.0 Main Line & Valve
WA-3.1 Standard Valve Box and Cover
WA-3.2 Mechanical Restraints
WA-3.3 Water Pipe Trench Bedding and Backfill
WA-4.0 Standard Manual Air Release Valve
WA-4.1 Combination Air Release Valve
WA-4.2 Standard 2" Blowoff Assembly
WA-4.3 Temp. Construction Blowoff Assembly
WA-4.4 Pipe and Casing
WA-5.0 Standard Double Check Valve Assembly 2" & Smaller
WA-5.1 Standard Double Check Valve Assembly 2 1/2" & Larger
WA-5.2 DVCA Installation
WA-5.3 Standard Reduced Pressure Principal Backflow Assembly 2" & Smaller
WA-5.4 Standard Reduced Pressure Backflow Assembly 2 1/2" & Larger
WA-6.0 Standard Fire Protection Backkflow Locations
WA-6.1 Standard Domestic Meter Locations
WA-6.2 Commercial/Multi-Family Water/DCVA Installation Location
WA-7.0 Testing Type and Frequency
Storm Water Management Plan:
Stormwater Master Plan
Table of Contents
Executive Summary
Section 1 - Introduction
Section 2 - Study Area
Figure 2-2
Figure 2-3
Figure 2-4
Figure 2-5
Figure 2-6
Section 3 - Development Approach
Figure 3-1
Section 4 - Existing Summary
Figure 4-1
Figure 4-2
Section 5 - Regulatory Overview
Section 6 - NPDES Phase II Compliance
Table 6-1
Table 6-1 continued
Section 7 - Water Quality Improvement
Figure 7-1
Section 8 - Capitol Improvement Program
Figure 8-1
Table 8-2
Appendices A & B
Figure B-1
Appendix C & D
Transportation System Plan:
Transportation Master Plan
6-Year Transportation Improvement Program (2007-2012)
6-Year Transportation Improvement Program Map
Appendix
Battle Ground TSP Final Draft 2005 Cover
Battle Ground TSP Final Draft 2005
Figure 2-1 Existing Functional Classification
Figure 2-2 Existing Intersection Characteristics
Figure 2-3 Existing Intersection Characteristics (Downtown Area)
Figure 2-4 Existing PM Peak Hour Traffic Volumes
Figure 2-5 Existing PM Peak Hour Traffic Volumes (Downtown Area)
Figure 2-6 Existing Posted Speed On Arterial And Collector Streets
Figure 2-7 Public/Quasi-Public Transportation Routes
Figure 2-8 Existing Bicycle Facilities
Figure 2-9 Existing Pedestrian Facilities
Figure 2-10 Planned/Programmed Roadway Improvements
Figure 4-1 2023 PM Peak Hour Traffic Volumes
Figure 4-2 2023 PM Peak Hour Traffic Volumes (Downtown Area)
Figure 4-3 Recommended Street Functional Classification System
Figure 5-1 Recommended Truck Routes
Figure 7-1 Planned/Pending Bicycle System Improvements
Figure 7-2 Planned/Pending Pedestrian System Improvements
Figure 7-3 Recommended Bicycle System Improvements
Figure 7-4 Recommended Pedestrian System Improvements
Figure 9-1 Recommended Improvements To Existing Roadways
Figure 9-2 Recommended New Roadways
Water System Plan:
Water System Plan - October 2004
Water System Plan - December 2004
Exhibit C1
Exhibit C2
Exhibit C3
Exhibit C4
Exhibit C5
Copyright 2007 City of Battle Ground
Site Terms & Conditions
Design by Enrich Media Inc.